The Biohazard Brewpub Project
It was decided that walls were needed so that brewing could be accomplished in adverse weather conditions. Below are photo's of the walls as the contractor left them.
Note the shop lights on the ceiling and the bare concrete floor. The first brewing attempt under these conditions left a lot to be desired. The heat from the burners and decor were unbearable. Something had to be done again.